Delivered and certified.
Explore our portfolio of tested fireproofing and firestopping systems across commercial, industrial and high-rise projects throughout Bangladesh.

Gulshan Corporate Tower
18,000 sqm SFRM on 24-floor steel frame + firestopping package
Tongi Garments Factory
Cementitious fireproofing to steel portal frames across 12,000 sqm
DMCH Hospital Extension
SFRM + firestopping + specialty systems across 8 clinical floors
Radisson Hotel Expansion
Thin-film intumescent coating on exposed feature steelwork, atrium
Chittagong Port Warehouse
High-temperature coatings to process pipework and structural steelwork
Bashundhara City Expansion
Full PFP package: SFRM, firestopping and cavity barriers across 8 levelsProven Performance
Explore our portfolio of tested fireproofing and firestopping systems across commercial, industrial and high-rise projects throughout Bangladesh.
Our Project Execution Process
A disciplined six-stage delivery sequence designed so fire protection never stalls structural or MEP schedules.
Consultation & Assessment
Understanding project requirements, reviewing drawings, and assessing fire protection needs.
Engineering Design Philosophy & BOQ Preparation
Developing the design philosophy, determining fire resistance requirements, preparing technical specifications, and BOQ.
Material Selection, Cost Estimation & Design Philosophy Approval
Selecting suitable fire protection products, preparing material submittals, developing cost estimates, and obtaining necessary design and material approvals.
Material Supply & Installation
Supplying approved materials and executing fire protection systems through professional installation and application.
Quality Control & Inspection
Verifying installation quality, applied thickness, workmanship, and compliance with approved specifications.
Testing, Commissioning, Documentation & Handover
Conducting applicable inspections and tests, preparing project documentation, and completing final project handover.