OUR SERVICES

Five systems. One certified envelope.

Comprehensive Passive Fire Protection solutions - from technical specification and material supply to professional installation, inspection and project handover.

BARE STEEL TO FIREPROTECTED STRUCTUREDRAG TO ROTATE ⟲
FIREPROOFING SPRAY IN PROGRESS
COATEDEXPOSED STEEL
Applicator spraying cementitious SFRM fireproofing onto a structural steel I-beam
Cementitious Fireproofing (SFRM) photo 1
Cementitious spray-applied fire-resistive material applied to overhead steel framing
Cementitious Fireproofing (SFRM) photo 2
Trained applicator coating heavy steel roof trusses with cementitious SFRM
Cementitious Fireproofing (SFRM) photo 3
SYSTEM SPECIFICATION & STANDARDS
Cementitious spray-applied fire-resistive material
Interior or exterior-grade systems, according to exposure conditions
Thickness determined using approved product data and tested designs
Reinforcement mesh and surface preparation, where required
ASTM E119, UL 263, EN 13381-4 and EN 13501-2
As-applied thickness logs and final inspection documentation
FIRE-RESISTANCE RATING

Up to 4 hours (240 minutes)

Typical ratings include 60, 90, 120, 180 and 240 minutes, depending on the tested product system.

HOW WE WORK

Our Project Execution Process

A disciplined six-stage delivery sequence designed so fire protection never stalls structural or MEP schedules.

01

Consultation & Assessment

Understanding project requirements, reviewing drawings, and assessing fire protection needs.

02

Engineering Design Philosophy & BOQ Preparation

Developing the design philosophy, determining fire resistance requirements, preparing technical specifications, and BOQ.

03

Material Selection, Cost Estimation & Design Philosophy Approval

Selecting suitable fire protection products, preparing material submittals, developing cost estimates, and obtaining necessary design and material approvals.

04

Material Supply & Installation

Supplying approved materials and executing fire protection systems through professional installation and application.

05

Quality Control & Inspection

Verifying installation quality, applied thickness, workmanship, and compliance with approved specifications.

06

Testing, Commissioning, Documentation & Handover

Conducting applicable inspections and tests, preparing project documentation, and completing final project handover.