Cementitious Fireproofing (SFRM)

SIMPLE DESCRIPTION

Cementitious Spray-Applied Fire-Resistive Material (SFRM) is a protective coating applied to structural steel members to provide thermal insulation and improve their fire resistance.

HOW IT WORKS

When exposed to high temperatures, the cementitious coating acts as an insulating barrier, slowing the heat transfer to structural steel. This helps maintain the steel's load-bearing capacity for the specified fire-resistance period.

KEY BENEFITS
Provides thermal protection to structural steel.
Helps maintain structural stability during fire exposure.
Covers complex steel profiles and connections.
Suitable for large-scale industrial and commercial projects.
Cost-effective protection for suitable applications.
WHERE TO APPLY IT
Structural steel beams and columns.
RMG factories and industrial facilities.
Warehouses and logistics centres.
Commercial and high-rise buildings.
Shopping malls and infrastructure facilities.
FIRE-RESISTANCE RATING

Up to 4 hours (240 minutes)

Typical ratings include 60, 90, 120, 180 and 240 minutes, depending on the tested product system.

SYSTEM SPECIFICATION & STANDARDS
Cementitious spray-applied fire-resistive material.
Interior or exterior-grade systems, according to exposure conditions.
Thickness determined using approved product data and tested designs.
Reinforcement mesh and surface preparation, where required.
ASTM E119, UL 263, EN 13381-4 and EN 13501-2.
SYSTEM TYPECementitious SFRM
FIRE RATINGUp to 4 HR (240 min)
STANDARDSASTM E119 / UL 263 / EN 13381-4
DELIVERABLEAs-applied thickness logs
FREQUENTLY ASKED QUESTIONS

Does cementitious SFRM meet BNBC 2020 Part 4 requirements?

Yes. Our cementitious SFRM systems are specified and applied in accordance with BNBC 2020 Part 4 and international fire test standards including ASTM E119, UL 263, EN 13381-4 and EN 13501-2.

What fire-resistance ratings are achievable with SFRM?

Typical ratings include 60, 90, 120, 180 and up to 240 minutes (4 hours), depending on the tested product system and required thickness.

Intumescent Fireproofing (IFRM)

Specifying PFP for a project?

Free site assessment: ratings review, scope outline and budget figures within one week.